Assess whether integration costs were sandbagged in the CIM (5bd236)
August 31, 2026 · By SmartSolo
Situation
A founder who will not sign a non-compete put post-merger systems-integration risk register in front of carve-out separation lead in a health-system acquiring a specialty practice. This M&A Due Diligence / People and Contracts close is integration costs were sandbagged from post-merger systems-integration risk register, and the live options are Proceed, Reprice, Walk.
Decision
Carve-out separation lead in a health-system acquiring a specialty practice must choose Proceed / Reprice / Walk / Hold using post-merger systems-integration risk register after a founder who will not sign a non-compete.
Hypotheses to test
- The population in post-merger systems-integration risk register is the one a founder who will not sign a non-compete named, so Proceed follows for this People and Contracts file.
- The population in post-merger systems-integration risk register is adjacent only to a founder who will not sign a non-compete; Reprice is the honest M&A Due Diligence call.
- A health-system acquiring a specialty practice already contained a founder who will not sign a non-compete before post-merger systems-integration risk register arrived; no new People and Contracts path.
- Provenance on post-merger systems-integration risk register after a founder who will not sign a non-compete is broken; do not pick Proceed or Reprice yet.
Analysis required
- Separate a one-off add-back from a recurring earnings issue in post-merger systems-integration risk register.
- Map reps, earnout mechanics, and integration risk a health-system acquiring a specialty practice would inherit.
- Tie quality-of-earnings, working-capital, and contingent items in post-merger systems-integration risk register to integration costs were sandbagged.
- For this M&A Due Diligence People and Contracts file, read post-merger systems-integration risk register against a founder who will not sign a non-compete and write the one fact that would move integration costs were sandbagged for carve-out separation lead.
Recommendation
Choose Proceed / Reprice / Walk / Hold on this M&A Due Diligence / People and Contracts packet (post-merger systems-integration risk register after a founder who will not sign a non-compete). Lead with the M&A Due Diligence option post-merger systems-integration risk register can support after a founder who will not sign a non-compete, then the two facts that force it, then the Monday action for carve-out separation lead in a health-system acquiring a specialty practice.
Explore more
More M&A Due Diligence prompts
- Assess whether a top customer is actually sticky (62d019)
- Assess whether related-party sales should be backed out of valuation (fda282)
- Assess whether IP is owned or merely licensed (08759f)
- Assess whether environmental liability is capped or open-ended (59a3b6)
- Assess whether integration costs were sandbagged in the CIM (b8b377)
Explore related decision areas
- Assess whether books should be restated or merely adjusted (efb469)Forensic Accounting
- Assess whether a vendor is a disguised related party (d750a6)Forensic Accounting
- Is Referral to Counsel Warranted?Forensic Accounting
See governed multi-model AI on your own prompt
Compare GPT-5, Claude, and Gemini side by side, with human review and a decision record built in.

