Assess whether integration costs were sandbagged in the CIM (bb4e4b)
August 31, 2026 · SmartSolo
Situation
QoE add-backs the seller marked 'normalized' arrived with a CIM that omitted a material litigation for carve-out separation lead. That is a M&A Due Diligence People and Contracts decision on integration costs were sandbagged in a health-system acquiring a specialty practice.
Decision
Carve-out separation lead in a health-system acquiring a specialty practice must choose Proceed / Reprice / Walk / Hold using QoE add-backs the seller marked 'normalized' after a CIM that omitted a material litigation.
Hypotheses to test
- Authorize Proceed now; QoE add-backs the seller marked 'normalized' already has the discriminator after a CIM that omitted a material litigation.
- Keep Reprice in force until QoE add-backs the seller marked 'normalized' is completed after a CIM that omitted a material litigation for carve-out separation lead.
- Treat QoE add-backs the seller marked 'normalized' as Walk because both readings appear after a CIM that omitted a material litigation.
- Refuse a M&A Due Diligence close: carve-out separation lead does not have the page integration costs were sandbagged turns on in QoE add-backs the seller marked 'normalized'.
Analysis required
- Test whether a CIM that omitted a material litigation is a diligence gap, a price chip, or a walk-away.
- Separate a one-off add-back from a recurring earnings issue in QoE add-backs the seller marked 'normalized'.
- Map reps, earnout mechanics, and integration risk a health-system acquiring a specialty practice would inherit.
- For this M&A Due Diligence People and Contracts file, read QoE add-backs the seller marked 'normalized' against a CIM that omitted a material litigation and write the one fact that would move integration costs were sandbagged for carve-out separation lead.
Recommendation
Choose Proceed / Reprice / Walk / Hold on this M&A Due Diligence / People and Contracts packet (QoE add-backs the seller marked 'normalized' after a CIM that omitted a material litigation). The follow-on People and Contracts action is what carve-out separation lead does next: implement the option, assign an owner, and log the missing fact.
Command returns
Explore more
More M&A Due Diligence prompts
- Assess whether environmental liability is capped or open-ended (1689d1)
- Commercial-diligence partner must resolve whether working capital should be
- Assess whether earnout definitions will cause a post-close fight (f748f0)
- Assess whether the carve-out is operable on day one (2230b7)
- Assess whether integration costs were sandbagged in the CIM (5bd236)
Explore related decision areas
See governed multi-model AI on your own prompt
Compare GPT-5, Claude, and Gemini side by side, with human review and a decision record built in.

